CIL - Supporting documents
-
ED 3-01 - Swindon Borough Local Plan Submission Document (June 2013)
-
ED 3-01a Proposed Modifications Local Plan
-
ED 3-01b - Main Modifications - Schedule A
-
ED 3-01c - Other Modifications - Schedule B
-
ED 3-01d - Appendix 1 - Inset Map Modifications
-
ED 3-01e - Appendix 2 - Proposed Map Modifications
-
ED 3-02 - Infrastructure Delivery Plan Submission Document (June 2013)
-
ED 3-02a Infrastructure Delivery Plan March 2014
-
ED 3-03 - Local Plan Core Documents Library
-
ED 3-03a Core documents Library 09_6_13
-
ED 3-04 - Swindon Central Area Action Plan Feb 2009
-
ED 3-05 - Development Control Developer Contributions Guidance Note 2010 update
-
ED 3-07a - Cabinet Extract 10 September 2014 Agenda Item 9 (with Appendix 1 and 2)
-
ED 3-07b - Housing Strategy 2015-2026 (Appendix 3)
-
ED 3-07c - Cabinet Extract 10 September 2014 Printed Minutes
-
ED 3-08 - Housing Standards Review Technical Consultation
-
CD 8.36 - Swindon Water Cycle Study (CH2MHILL)
-
CD 8.42 Thames Water Revised Draft Resources Management Plan 2015-2040
-
CD 11.17 - Costs of building to the Code for Sustainable Homes
-
CD 25.67 - Council Statement CS19 Response to MF7 (water resources)
-
Local Plan Examination by SBC Theme 1
-
Local Plan Examination Statement of Common Ground - Thames Water